HT

Heat-treated pallets: what changes in the build

Heat treatment is a process, not a pallet shape. Any build can be heat treated: the wood core is held at 56 degrees Celsius or higher for at least 30 minutes, then the pallet is marked.

Request a priceBuilds

Core temperature
56 C or more
Time
30 minutes
Marked
ISPM 15

01 Process, not frame

A block pallet and a stringer pallet can both be HT. The frame decides how forks enter and how stiff it is. The treatment decides whether the pallet can go overseas. The two choices are independent, and the request should list them separately.

02 What the process requires

  1. Debark the wood first. Bark under 3 cm wide, or under 50 square cm if wider, is allowed.
  2. Heat the core to at least 56 C (133 F).
  3. Hold for at least 30 minutes.
  4. Apply the ISPM 15 mark.

03 What it does not do

It does not make the wood mould-proof. HT pallets loaded into trailer vans while still hot are susceptible to mould. Moisture below 20% is the working threshold. The moisture guide covers storage.

04 Build and treatment together

BuildHT possibleNote
BlockYesCommon for heavy crates
StringerYesCommon for general freight
Two-wayYesTreatment does not change entry
Four-wayYesTreatment does not change entry

05 When it is asked for

  • Freight leaving the country.
  • Buyers whose own rules require it.
  • Cold storage where pests are a concern.
  • Any shipper that wants one pallet type for all lanes.

06 Verification at receipt

A receiving clerk can check that each pallet carries a legible mark, that the code looks consistent across the shipment and that no replacement boards break the pattern. Written notes from the supplier help in a dispute.

07 Treatment variants

Heat treatment comes in several variants: standard chamber, kiln-dried, mobile truck-based, portable chamber and fast container connector. Methyl bromide fumigation is done in a container or under a tent, each followed by a 24-hour quarantine. In Australia the standard was adopted on 1 July 2010; the European Union adopted ISPM 15 in March 2005 and the United States and Canada in September 2005.

Q Questions

Does HT change the load rating?

Not by itself. Rating comes from the build, the lumber and the load.

Does HT shorten a pallet's life?

The sources used here do not say so. Ask the builder about the lumber.

Does heat treatment change the price?

Usually yes, since it adds a step, though the size of the difference varies.

Is kiln dried the same as heat treated?

No. Kiln drying lowers moisture. Heat treatment holds the core at a set temperature for a set time. A pallet can be one without the other.

Src Sources

Req Ready to ask?

One short form covers buying, selling and clearing. Request a price

Request a price